Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

On-line and semi-online scheduling for flow shop problems on two machines

From MaRDI portal
Publication:2841141
Jump to:navigation, search

DOI10.1080/02331934.2011.622759zbMath1273.90088OpenAlexW2064017604MaRDI QIDQ2841141

No author found.

Publication date: 24 July 2013

Published in: Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/02331934.2011.622759


zbMATH Keywords

algorithmschedulinglower boundflow shopon-line


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

Online scheduling of ordered flow shops




Cites Work

  • Approximation results for flow shop scheduling problems with machine availability constraints
  • Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
  • Optimal two- and three-stage production schedules with setup times included
  • Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates
  • Flowshop and Jobshop Schedules: Complexity and Approximation
  • Unnamed Item




This page was built for publication: On-line and semi-online scheduling for flow shop problems on two machines

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2841141&oldid=15768265"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 19:20.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki