Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations

From MaRDI portal
Publication:284850

DOI10.1016/j.dam.2016.03.005zbMath1343.90041OpenAlexW2320817715MaRDI QIDQ284850

Olga Battaïa, Alexandre Dolgui, André Rossi, Evgeny E. Gurevsky

Publication date: 18 May 2016

Published in: Discrete Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.dam.2016.03.005




Related Items (6)



Cites Work


This page was built for publication: Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations