Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
From MaRDI portal
Publication:2872634
DOI10.1080/00207721.2012.659702zbMath1278.93291OpenAlexW2044746498MaRDI QIDQ2872634
Publication date: 15 January 2014
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207721.2012.659702
Reliability, availability, maintenance, inspection in operations research (90B25) Optimal stochastic control (93E20)
Related Items (3)
Optimally maintaining a multi-state system with limited imperfect preventive repairs ⋮ Optimum random and age replacement policies for customer-demand multi-state system reliability under imperfect maintenance ⋮ EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment
Cites Work
- Robust planning in optimization for production system subject to random machine breakdown and failure in rework
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Imperfect maintenance
- The effect of capital lockup and customer trade credits on the optimal lot size -- a confirmation of the EPQ.
- Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
- Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
- Extended periodic imperfect preventive maintenance model of a system subjected to shocks
- Optimum Preventive Maintenance Policies
- Periodic-replacement models with threshold levels
- Replacement policies for a cumulative damage model with minimal repair at failure
- An EMQ model in an imperfect production process
- Fuzzy EPQ models for an imperfect production system
- Optimum Policies for a System with Imperfect Maintenance
- Sequential imperfect preventive maintenance policies
- Optimum Policies When Preventive Maintenance is Imperfect
- Lot Sizing with Random Yields: A Review
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
This page was built for publication: Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance