Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times

From MaRDI portal
Publication:2883551
Jump to:navigation, search

DOI10.1016/j.endm.2010.05.009zbMath1237.90095OpenAlexW2004504409MaRDI QIDQ2883551

Arslan M. Ornek, Cemalettin Öztürk, Semra Tunalı, Brahim Hnich

Publication date: 13 May 2012

Published in: Electronic Notes in Discrete Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.endm.2010.05.009


zbMATH Keywords

schedulingsequencingmixed integer programmingbalancingconstraint programmingmixed model assembly lines


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)


Related Items (4)

Balancing mixed-model assembly lines with sequence-dependent tasks via hybrid genetic algorithm ⋮ Mixed model line balancing with parallel stations, zoning constraints, and ergonomics ⋮ Operational extended model formulations for advanced planning and scheduling systems ⋮ Combinatorial Benders cuts for assembly line balancing problems with setups




Cites Work

  • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line




This page was built for publication: Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2883551&oldid=15834099"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 19:31.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki