IP-Based Energetic Reasoning for the Resource Constrained Project Scheduling Problem
From MaRDI portal
Publication:2883582
DOI10.1016/J.ENDM.2010.05.046zbMath1237.90092OpenAlexW2062572375MaRDI QIDQ2883582
Mohamed Haouari, Anis Kooli, Lotfi Hidri, Emmanuel Néron
Publication date: 13 May 2012
Published in: Electronic Notes in Discrete Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.endm.2010.05.046
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Related Items (2)
Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem ⋮ A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
Uses Software
Cites Work
- Unnamed Item
- Energetic reasoning revisited: Application to parallel machine scheduling
- Scheduling subject to resource constraints: Classification and complexity
- PSPLIB -- a project scheduling problem library
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Tight LP bounds for resource constrained project scheduling
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Une méthode arborescente pour résoudre les problèmes cumulatifs
This page was built for publication: IP-Based Energetic Reasoning for the Resource Constrained Project Scheduling Problem