Multi-objective optimization method of flexible job-shop lot-splitting scheduling
From MaRDI portal
Publication:2886120
DOI10.3785/J.ISSN.1008-973X.2011.04.022zbMath1249.90084OpenAlexW2388055045MaRDI QIDQ2886120
Yun Wang, Yixiong Feng, Yicong Gao, Jianrong Tan
Publication date: 1 June 2012
Full work available at URL: https://en.cnki.com.cn/Article_en/CJFDTOTAL-ZDZC201104021.htm
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70) Multivariate analysis and fuzziness (62H86)
This page was built for publication: Multi-objective optimization method of flexible job-shop lot-splitting scheduling