Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

scientific article

From MaRDI portal
Publication:2895091
Jump to:navigation, search

zbMATH Open1243.90066MaRDI QIDQ2895091

Xueguang Cheng, Shi Ling

Publication date: 2 July 2012



Title of this publication is not available (Why is that?)


zbMATH Keywords

complexity resultsflow-shop scheduling problemtransportation delaysingle robot


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)



Related Items (4)

Complexity results for flow-shop and open-shop scheduling problems with transportation delays ⋮ Complexity of one-cycle robotic flow-shops ⋮ Makespan minimization for flow-shop problems with transportation times and a single robot ⋮ Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times






This page was built for publication:

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2895091)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2895091&oldid=15858403"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 3 February 2024, at 20:34.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki