Scheduling Aircraft to Reduce Controller Workload
From MaRDI portal
Publication:2917317
DOI10.4230/OASIcs.ATMOS.2009.2144zbMath1247.90089OpenAlexW1516101776MaRDI QIDQ2917317
Alexander Kröller, Joondong Kim, Joseph S. B. Mitchell, Girishkumar R. Sabhnani
Publication date: 28 September 2012
Full work available at URL: https://drops.dagstuhl.de/opus/volltexte/2009/2144/pdf/KimJoondong.Paper.2144.pdf
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Traffic problems in operations research (90B20)
Related Items (5)
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness ⋮ A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure ⋮ No-wait flowshop scheduling problem with two criteria; total tardiness and makespan ⋮ A survey of scheduling problems with no-wait in process ⋮ Air traffic flow management with layered workload constraints
This page was built for publication: Scheduling Aircraft to Reduce Controller Workload