Accelerating Time-Dependent Multi-Criteria Timetable Information is Harder Than Expected
From MaRDI portal
Publication:2917326
DOI10.4230/OASIcs.ATMOS.2009.2148zbMath1247.90024OpenAlexW1575936991MaRDI QIDQ2917326
Andreas Gebhardt, Annabell Berger, Daniel Delling, Matthias Müller-Hannemann
Publication date: 28 September 2012
Full work available at URL: https://dblp.uni-trier.de/db/conf/atmos/atmos2009.html#BergerDGM09
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80) Computing methodologies for information systems (hypertext navigation, interfaces, decision support, etc.) (68U35)
Related Items (4)
Trip-Based Public Transit Routing ⋮ Connection Scan Algorithm ⋮ Shortest-path queries in static networks ⋮ User-Constrained Multimodal Route Planning
This page was built for publication: Accelerating Time-Dependent Multi-Criteria Timetable Information is Harder Than Expected