Monitoring Process Mean and Variance with a Single Generally Weighted Moving Average Chart
DOI10.1080/03610926.2011.558659zbMath1272.62153OpenAlexW2168803016MaRDI QIDQ2920029
S. Y. Teh, Michael B. C. Khoo, Zhang Wu
Publication date: 23 October 2012
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610926.2011.558659
process meanaverage run length (ARL)process variancestandard deviation of the run length (SDRL)combined GWMA chartmax-GWMA chartsingle control chart
Applications of statistics in engineering and industry; control charts (62P30) Exact distribution theory in statistics (62E15)
Related Items (7)
Cites Work
- A generalized age and block replacement of a system subject to shocks
- Fast initial response features for EWMA control charts
- Extended optimal replacement model for deteriorating systems
- The extended GWMA control chart
- Generally weighted moving average control charts with fast initial response features
- MONITORING AUTOCORRELATED PROCESS MEAN AND VARIANCE USING A GWMA CHART BASED ON RESIDUALS
- Monitoring the mean of autocorrelated observations with one generally weighted moving average control chart
- Optimal number of minimal repairs before replacement of a system subject to shocks
- Poisson GWMA Control Chart
This page was built for publication: Monitoring Process Mean and Variance with a Single Generally Weighted Moving Average Chart