Integrated Scheduling of Quay Cranes and Automated Lifting Vehicles in Automated Container Terminal with Unlimited Buffer Space
From MaRDI portal
Publication:2950471
DOI10.1007/978-3-319-01857-7_58zbMath1322.90039OpenAlexW122183314MaRDI QIDQ2950471
Napsiah Ismail, Tang Sai Hong, Mohd Khairol Anuar Ariffin, Seyed Hamidreza Sadeghian
Publication date: 9 October 2015
Published in: Advances in Intelligent Systems and Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-01857-7_58
integrated schedulingvehicleautomated container terminalquay craneautomated liftingunlimited buffer space
This page was built for publication: Integrated Scheduling of Quay Cranes and Automated Lifting Vehicles in Automated Container Terminal with Unlimited Buffer Space