Reducing patient-flow delays in surgical suites through determining start-times of surgical cases
DOI10.1016/j.ejor.2014.03.043zbMath1338.90171OpenAlexW2038103762MaRDI QIDQ296824
Publication date: 23 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.03.043
fuzzy setsdownstream resource constraintflexible job shop scheduling with time-lagmulti-objective problemsurgery scheduling under uncertainty
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (10)
Cites Work
- Scheduling elective surgery under uncertainty and downstream capacity constraints
- Operating room planning and scheduling: a literature review
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time
- Surgical case scheduling as a generalized job shop scheduling problem
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
- A genetic algorithm for flexible job shop scheduling with fuzzy processing time
- The Complexity of Flowshop and Jobshop Scheduling
- Scheduling patients in an ambulatory surgical center
This page was built for publication: Reducing patient-flow delays in surgical suites through determining start-times of surgical cases