An integrated approach for earthwork allocation, sequencing and routing
From MaRDI portal
Publication:296873
DOI10.1016/j.ejor.2014.04.036zbMath1338.90228OpenAlexW2037421132MaRDI QIDQ296873
Robert L. Burdett, Erhan Kozan
Publication date: 23 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://eprints.qut.edu.au/70486/1/masshaul_paper_4_2014_preprint.pdf
Programming involving graphs or networks (90C35) Approximation methods and heuristics in mathematical programming (90C59) Case-oriented studies in operations research (90B90) Discrete location and assignment (90B80)
Related Items (7)
A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction ⋮ Multi-objective models and techniques for analysing the absolute capacity of railway networks ⋮ Optimisation models for expanding a railway's theoretical capacity ⋮ Optimizing horizontal alignment of roads in a specified corridor ⋮ A generalized constructive algorithm using insertion-based heuristics ⋮ Stockpile scheduling with geometry constraints in dry bulk terminals ⋮ A flexible job shop scheduling approach with operators for coal export terminals
Cites Work
- Unnamed Item
- Fast shortest-paths algorithms in the presence of few destinations of negative-weight arcs
- Models and algorithms to improve earthwork operations in road design using mixed integer linear programming
- A sliding time window heuristic for open pit mine block sequencing
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- A mathematical programming viewpoint for solving the ultimate pit problem
- A classification of formulations for the (time-dependent) traveling salesman problem
- An application of branch and cut to open pit mine scheduling
- Solving the shortest route cut and fill problem using simulated annealing
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- The time dependent traveling salesman problem: polyhedra and algorithm
- A sequencing approach for creating new train timetables
- Solving LP Relaxations of Large-Scale Precedence Constrained Problems
- The Time-Dependent Traveling Salesman Problem and Its Application to the Tardiness Problem in One-Machine Scheduling
- Tabu search embedded simulated annealing for the shortest route cut and fill problem
This page was built for publication: An integrated approach for earthwork allocation, sequencing and routing