Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming
From MaRDI portal
Publication:2974712
DOI10.1007/978-3-319-42105-6_14zbMath1397.90364OpenAlexW2587707607MaRDI QIDQ2974712
Gyan Bahadur Thapa, Sergei D. Silvestrov
Publication date: 10 April 2017
Published in: Springer Proceedings in Mathematics & Statistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-42105-6_14
Nonlinear programming (90C30) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Solving symmetric mixed-model multi-level just-in-time scheduling problems
- Heuristics and exact algorithms for solving the Monden problem
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Minimizing variation of production rates in just-in-time systems: A survey
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Computational Complexity of Discrete Optimization Problems
- Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
- Sequencing problem for a mixed-model assembly line in the Toyota production system
This page was built for publication: Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming