An Investigation of Heuristic Decomposition to Tackle Workforce Scheduling and Routing with Time-Dependent Activities Constraints
DOI10.1007/978-3-319-53982-9_14zbMath1360.90127OpenAlexW2547761334MaRDI QIDQ2980180
J. Arturo Castillo-Salazar, Wasakorn Laesanklang, Dario Landa-Silva
Publication date: 28 April 2017
Published in: Operations Research and Enterprise Systems (Search for Journal in Brave)
Full work available at URL: http://eprints.nottingham.ac.uk/41537/
mixed integer programmingproblem decompositiontime-dependent activities constraintsworkforce scheduling and routing problem
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- Workforce scheduling and routing problems: literature survey and computational study
- Metaheuristics for solving a multimodal home-healthcare scheduling problem
- Scheduling technicians and tasks in a telecommunications company
- \textsc{Laps}\ \textsc{Care} -- an operational system for staff planning of home care
- D-Ants: Savings Based Ants divide and conquer the vehicle routing problem.
- Effective heuristic procedures for a field technician scheduling problem
- The home care crew scheduling problem: preference-based visit clustering and temporal dependencies
- An Investigation of Heuristic Decomposition to Tackle Workforce Scheduling and Routing with Time-Dependent Activities Constraints
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- Decomposition Principle for Linear Programs
- Extended Decomposition for Mixed Integer Programming to Solve a Workforce Scheduling and Routing Problem
This page was built for publication: An Investigation of Heuristic Decomposition to Tackle Workforce Scheduling and Routing with Time-Dependent Activities Constraints