Single-machine scheduling with maintenance in a manufacturing system
From MaRDI portal
Publication:2997966
DOI10.1080/02522667.2008.10699820zbMath1211.90079OpenAlexW2088923009MaRDI QIDQ2997966
Publication date: 10 May 2011
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: http://www.connectjournals.com/file_html_pdf/56703H_jios270_543-556_abs.htm
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Cites Work
- Solving a bicriterion scheduling problem
- Use of variable range in solving multiple criteria scheduling problems
- Minimizing the sum of job completion times on capacitated parallel machines
- Multicriteria scheduling
- Scheduling the maintenance on a single machine
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
- One machine sequencing to minimize mean flow time with minimum number tardy
This page was built for publication: Single-machine scheduling with maintenance in a manufacturing system