Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach - MaRDI portal

Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach

From MaRDI portal
Publication:3008607

DOI10.1080/02522667.2010.10699997zbMath1231.90180OpenAlexW1963761699MaRDI QIDQ3008607

Ming-Jong Yao, Yu-Jen Chang

Publication date: 22 June 2011

Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)

Full work available at URL: http://www.connectjournals.com/file_html_pdf/801004H_jios440_809-835a.pdf






Cites Work


This page was built for publication: Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach