A WIP control policy for tandem lines
From MaRDI portal
Publication:3012658
DOI10.1080/00207540701579522zbMath1216.90042OpenAlexW2066825015MaRDI QIDQ3012658
Rongling Yang, Velusamy Subramaniam, Ruifeng Chen, Surya Prakash Singh
Publication date: 6 July 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701579522
Related Items (2)
Performance analysis of a manufacturing line operated under optimal surplus-based production control ⋮ Frequency and time-domain analysis on performance of a production line operated by observer-based distributed control
Cites Work
- Push and Pull Production Systems: Issues and Comparisons
- Analysis of production control systems kanban and CONWIP
- A comparison of production-line control mechanisms
- Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
- Optimal Control of a Two-Station Tandem Production/Inventory System
- Allocating work in process in a multiple-product CONWIP system with lost sales
This page was built for publication: A WIP control policy for tandem lines