Batch scheduling in a two-stage flow shop with parallel and bottleneck machines
From MaRDI portal
Publication:3021820
DOI10.1080/09720510.2005.10701150zbMath1068.90055OpenAlexW1983847084MaRDI QIDQ3021820
Antonio Grieco, Gianpaolo Ghiani, Pierpaolo Caricato, Roberto Musmanno
Publication date: 21 June 2005
Published in: Journal of Statistics and Management Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/09720510.2005.10701150
This page was built for publication: Batch scheduling in a two-stage flow shop with parallel and bottleneck machines