A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING
From MaRDI portal
Publication:3021988
DOI10.1142/S0129054102001473zbMath1067.68178OpenAlexW2047403924MaRDI QIDQ3021988
Haodi Feng, Guo Jun Li, Xiaotie Deng, Gui Zhen Liu
Publication date: 22 June 2005
Published in: International Journal of Foundations of Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0129054102001473
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Approximation algorithms (68W25)
Related Items (3)
Model approximation for batch flow shop scheduling with fixed batch sizes ⋮ Mixed batch scheduling on identical machines ⋮ Batch scheduling of nonidentical job sizes with minsum criteria
Cites Work
This page was built for publication: A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING