An approximate solution of the flow-shop problem with sequence dependent setup times
From MaRDI portal
Publication:3035126
DOI10.1007/BF01415942zbMath0692.90060OpenAlexW2055162959MaRDI QIDQ3035126
Wlodzimierz Szwarc, John J. Liu
Publication date: 1989
Published in: [https://portal.mardi4nfdi.de/entity/Q3031760 ZOR Zeitschrift f�r Operations Research Methods and Models of Operations Research] (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01415942
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- The two-machine sequence dependent flowshop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Flow Shop Problems with Time Lags
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
- Sequencing n jobs on two machines with setup, processing and removal times separated
This page was built for publication: An approximate solution of the flow-shop problem with sequence dependent setup times