A job shop distributed scheduling based on Lagrangian relaxation to minimise total completion time
From MaRDI portal
Publication:3055211
DOI10.1080/00207540701824217zbMath1198.90188OpenAlexW2157536916MaRDI QIDQ3055211
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701824217
Related Items (3)
Fuzzy cleaner production in assembly flexible job-shop scheduling with machine breakdown and batch transportation: Lagrangian relaxation ⋮ Coordination mechanisms with mathematical programming models for decentralized decision-making: a literature review ⋮ Lagrangian relaxation of the generic materials and operations planning model
Cites Work
- Unnamed Item
- Supply chain management and advanced planning -- basics, overview and challenges
- Formulating the single machine sequencing problem with release dates as a mixed integer program
- Scheduling Problems with Two Competing Agents
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- The Complexity of Flowshop and Jobshop Scheduling
- Dynamic single-machine scheduling under distributed decision-making
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
This page was built for publication: A job shop distributed scheduling based on Lagrangian relaxation to minimise total completion time