Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication
DOI10.1080/00207540801914934zbMath1198.90278OpenAlexW2114595145MaRDI QIDQ3055389
Sujeong Lee, Kyungsup Kim, Taeeun Park, Kwangyoung Im
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540801914934
reassignmentdispatching ruleautomated material handling systemsblocking timeoverhead hoist transport
Transportation, logistics and supply chain management (90B06) Case-oriented studies in operations research (90B90)
Cites Work
- Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
- AGV dispatching
- A study of scheduling rules of flexible manufacturing systems: A simulation approach
- A hybrid modelling approach to the design of an AGV-based material handling system for an FMS
- A multi-attribute dispatching rule for automated guided vehicle systems
- Vehicle dispatching system based on Taguchi-tuned fuzzy rules
This page was built for publication: Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication