Economic lot scheduling problems incorporating a cost of using the production facility
From MaRDI portal
Publication:3055413
DOI10.1080/00207540801908076zbMath1198.90169OpenAlexW2116362645MaRDI QIDQ3055413
Anders Segerstedt, Pär Brander
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540801908076
Related Items (2)
Economic lot scheduling with resources in parallel ⋮ Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Unnamed Item
- A scheduling policy for adjusting economic lot quantities to a feasible solution
- An extension of the extended basic period approach for economic lot scheduling problems
- The economic lot scheduling problem without capacity constraints
- Lot Sizes, Lead Times and In-Process Inventories
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach
- A basic period approach to the economic lot scheduling problem with shelf life considerations
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- The economic lot scheduling problem under power-of-two policy
This page was built for publication: Economic lot scheduling problems incorporating a cost of using the production facility