Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
DOI10.1080/00207540701813210zbMath1198.90191OpenAlexW2049086692MaRDI QIDQ3055422
Jatinder N. D. Gupta, Shih-Wei Lin, Zne-Jung Lee, Kuo-Ching Ying
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701813210
schedulingsimulated annealingmeta-heuristicsflowshop manufacturing cellsequence-dependent family setups
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (8)
Cites Work
- Optimization by Simulated Annealing
- The two-machine sequence dependent flowshop scheduling problem
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- A survey of scheduling problems with setup times or costs
- Flowshop scheduling research after five decades
- A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
- An evaluation of group scheduling heuristics in a flow-line manufacturing cell
- Heuristics and sequence-dependent set-up jobs in flow line cells
This page was built for publication: Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times