PARALLEL MACHINE SCHEDULING WITH A SIMULTANEITY CONSTRAINT AND UNIT-LENGTH JOBS TO MINIMIZE THE MAKESPAN
From MaRDI portal
Publication:3074794
DOI10.1142/S0217595910002934zbMath1230.90094MaRDI QIDQ3074794
Xian-Wei Zhou, Yanpei Liu, Ruyan Fu, Lin Lin
Publication date: 10 February 2011
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Dynamic scheduling on parallel machines
- Parallel machine scheduling of machine-dependent jobs with unit-length.
- Batch processing with interval graph compatibilities between tasks
- Bounds for Multiprocessor Scheduling with Resource Constraints
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Bounds for Certain Multiprocessing Anomalies
This page was built for publication: PARALLEL MACHINE SCHEDULING WITH A SIMULTANEITY CONSTRAINT AND UNIT-LENGTH JOBS TO MINIMIZE THE MAKESPAN