Temporal linear relaxation in IBM ILOG CP optimizer
From MaRDI portal
Publication:309055
DOI10.1007/s10951-014-0408-7zbMath1347.90044OpenAlexW2052516771MaRDI QIDQ309055
Jérôme Rogerie, Philippe Laborie
Publication date: 7 September 2016
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-014-0408-7
Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (8)
Constraint programming and operations research ⋮ IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG ⋮ Packing by scheduling: using constraint programming to solve a complex 2D cutting stock problem ⋮ An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning ⋮ Dial-a-ride problem: mixed integer programming revisited and constraint programming proposed ⋮ Unnamed Item ⋮ Patrolling security games: definition and algorithms for solving large instances with single patroller and single intruder ⋮ A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects
Uses Software
Cites Work
- Unnamed Item
- Preemption in single machine earliness/tardiness scheduling
- An integrated method for planning and scheduling to minimize tardiness
- A new tabu search procedure for an audit-scheduling problem
- Convex envelopes of monomials of odd degree
- A hybrid approach to scheduling with earliness and tardiness costs
- Lagrangian bounds for just-in-time job-shop scheduling
- Detecting infeasibility and generating cuts for mixed integer programming using constraint programming
- Scheduling Aircraft Landings—The Static Case
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Mixed Integer Programming vs. Logic-Based Benders Decomposition for Planning and Scheduling
- Column Generation
- Principles and Practice of Constraint Programming – CP 2004
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates
This page was built for publication: Temporal linear relaxation in IBM ILOG CP optimizer