Resource allocation by means of project networks: Complexity results
From MaRDI portal
Publication:3113509
DOI10.1002/net.20415zbMath1230.90092OpenAlexW2092777352MaRDI QIDQ3113509
Publication date: 18 January 2012
Published in: Networks (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/net.20415
Programming involving graphs or networks (90C35) Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Resource and cost allocation (including fair division, apportionment, etc.) (91B32)
Related Items (2)
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations ⋮ Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Schedule-induced posets
- One-machine rescheduling heuristics with efficiency and stability as criteria
- The construction of stable project baseline schedules
- Executing production schedules in the face of uncertainties: a review and some future directions
- Resource allocation by means of project networks: Dominance results
- A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
This page was built for publication: Resource allocation by means of project networks: Complexity results