SINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPAN
From MaRDI portal
Publication:3114615
DOI10.1142/S021759591100334XzbMath1232.90207MaRDI QIDQ3114615
Publication date: 19 February 2012
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Related Items (1)
Cites Work
- Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- Scheduling with batching: A review
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A note on the complexity of the problem of two-agent scheduling on a single machine
- A multiple-criterion model for machine scheduling
- A survey of scheduling problems with setup times or costs
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Scheduling Problems with Two Competing Agents
- Survey of scheduling research involving setup times
This page was built for publication: SINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPAN