Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Project Scheduling Under Partially Renewable Resource Constraints - MaRDI portal

Project Scheduling Under Partially Renewable Resource Constraints

From MaRDI portal
Publication:3116657

DOI10.1287/mnsc.45.4.543zbMath1231.90178OpenAlexW2056965991MaRDI QIDQ3116657

Rainer Kolisch, Jan Böttcher, Frank Salewski, Andreas Drexl

Publication date: 12 February 2012

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/10419/175391




Related Items (29)

A two-stage stochastic programming approach for project planning with uncertain activity durationsA partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingPriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingAllocation of partially renewable resources: Concept, capabilities, and applicationsA project scheduling problem with periodically aggregated resource-constraintsPacking chained items in aligned bins with applications to container transshipment and project schedulingProject scheduling with finite or infinite number of activity processing modes -- a surveyA constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsA branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurementA branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraintsR\&D pipeline management: task interdependencies and risk managementProject scheduling with flexible resources: formulation and inequalitiesDismantling of nuclear power plants at optimal NPVBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementConsidering project management activities for engineering design groupsCase-based reasoning and improved adaptive search for project schedulingGRASP and path relinking for project scheduling under partially renewable resourcesA scatter search algorithm for project scheduling under partially renewable resourcesA survey of variants and extensions of the resource-constrained project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsResource-constrained project scheduling: Notation, classification, models, and methodsModeling and solving a bi-objective airport slot scheduling problemGreedEx---a scalable clearing mechanism for utility computingScheduling non-professional table-tennis leaguesDistribution requirements and compactness constraints in school timetablingProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensionsScheduling the professional soccer leagues of Austria and GermanyPersonnel scheduling and supplies provisioning in emergency relief operations




This page was built for publication: Project Scheduling Under Partially Renewable Resource Constraints