Review of the ordered and proportionate flow shop scheduling research

From MaRDI portal
Publication:3120585

DOI10.1002/NAV.21518zbMath1407.90171OpenAlexW2077168140MaRDI QIDQ3120585

Milton L. Smith, Christos P. Koulamas, Shrikant S. Panwalkar

Publication date: 5 March 2019

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.21518




Related Items (24)

Due-window assignment scheduling in the proportionate flow shop settingThe two-machine no-wait general and proportionate open shop makespan problemProportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobsProportionate flowshop scheduling with position-dependent weightsComplexity and approximation of open shop scheduling to minimize the makespan: a review of models and approachesMinsum and minmax scheduling on a proportionate flowshop with common flow-allowanceA state-of-the-art survey on multi-scenario schedulingProportionate Flow Shop Scheduling with RejectionA note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshopA note: minimizing maximum earliness on a proportionate flowshopOnline scheduling of ordered flow shopsMakespan minimization for the \(m\)-machine ordered flow shop scheduling problemMinmax scheduling and due-window assignment with position-dependent processing times and job rejectionFlow shops with reentry: reversibility properties and makespan optimal schedulesApproximation algorithms for the three-machine proportionate mixed shop schedulingScheduling a proportionate flow shop of batching machinesStudy on proportionate flowshop scheduling with due-date assignment and position-dependent weightsTwo-Machine Ordered Flow Shop Scheduling with Generalized Due DatesThree-stage ordered flow shops with either synchronous flow, blocking or no-idle machinesRegular scheduling measures on proportionate flowshop with job rejectionImproved algorithms for proportionate flow shop scheduling with due-window assignmentOnline algorithms to schedule a proportionate flexible flow shop of batching machinesTwo-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejectionProportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs







This page was built for publication: Review of the ordered and proportionate flow shop scheduling research