scientific article
From MaRDI portal
Publication:3131278
DOI10.13195/J.KZYJC.2016.0780zbMATH Open1389.90145MaRDI QIDQ3131278
Publication date: 29 January 2018
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39)
Related Items (4)
Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line โฎ Joint replenishment meets scheduling โฎ A kanban-based simulation study of a mixed model just-in-time manufacturing line โฎ Material allocation in MRP with tardiness penalties
Recommendations
- Unnamed Item ๐ ๐
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line ๐ ๐
- Balancing and scheduling of flexible mixed model assembly lines ๐ ๐
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems ๐ ๐
- Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines ๐ ๐
- Scheduling just-in-time part supply for mixed-model assembly lines ๐ ๐
- Scheduling the replenishment of just-in-time supermarkets in assembly plants ๐ ๐
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems ๐ ๐
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems ๐ ๐
- Revisiting the mixed-model multi-level just-in-time scheduling problem ๐ ๐
This page was built for publication: