Echelon stock formulation for multi-stage lot-sizing with component lead times
From MaRDI portal
Publication:3140043
DOI10.1080/00207729308949592zbMath0785.93010OpenAlexW2025177044WikidataQ126247380 ScholiaQ126247380MaRDI QIDQ3140043
Alistair Richard Clark, Vinicius Amaral Armentano
Publication date: 6 December 1993
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207729308949592
Related Items (3)
The application of valid inequalities to the multi-stage lot-sizing problem ⋮ METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES ⋮ A heuristic method for lot-sizing in multi-stage systems
Cites Work
- Minimum concave cost production system: A further generalization of multi-echelon model
- Dynamic Version of the Economic Lot Size Model
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Optimal Lot-Sizing Algorithms for Complex Product Structures
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Economic Lot Size Determination in Multi-Stage Assembly Systems
This page was built for publication: Echelon stock formulation for multi-stage lot-sizing with component lead times