Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times

From MaRDI portal
Publication:3153829
Jump to:navigation, search

DOI10.1080/002077201300029764zbMath1006.90046OpenAlexW2167262185MaRDI QIDQ3153829

Hark-Chin Hwang, Ji Ung Sun

Publication date: 12 March 2003

Published in: International Journal of Systems Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/002077201300029764


zbMATH Keywords

schedulinggenetic algorithm


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items

A survey of scheduling problems with setup times or costs ⋮ Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations ⋮ Modelling adaptive multi-agent manufacturing control with discrete event system formalism



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3153829&oldid=16428227"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 4 February 2024, at 07:50.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki