Reservoir operation using a fuzzy and neural system for hydrogeneration scheduling
From MaRDI portal
Publication:3153841
DOI10.1080/002077201300080875zbMATH Open1005.90534OpenAlexW2109800363MaRDI QIDQ3153841
Author name not available (Why is that?)
Publication date: 25 February 2003
Full work available at URL: https://doi.org/10.1080/002077201300080875
Deterministic scheduling theory in operations research (90B35) Neural networks for/in biological studies, artificial life and related topics (92B20) Fuzzy sets and logic (in connection with information, communication, or circuits theory) (94D05)
Related Items (1)
This page was built for publication: Reservoir operation using a fuzzy and neural system for hydrogeneration scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3153841)