A heuristic algorithm for a production planning problem in an assembly system
From MaRDI portal
Publication:3157305
DOI10.1057/palgrave.jors.2600683zbMath1054.90513OpenAlexW2093142676MaRDI QIDQ3157305
Publication date: 13 January 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600683
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (4)
Supply chain models for an assembly system with preprocessing of raw materials ⋮ Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers ⋮ Finite horizon planning with fixed-interval deliveries and no shortage ⋮ A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
This page was built for publication: A heuristic algorithm for a production planning problem in an assembly system