Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Job lateness in flowshops with setup and removal times separated

From MaRDI portal
Publication:3157767
Jump to:navigation, search

DOI10.1057/palgrave.jors.2600583zbMath1140.90386OpenAlexW2015138873MaRDI QIDQ3157767

Ali Allahverdi, Tariq A. Aldowaisan

Publication date: 19 January 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600583


zbMATH Keywords

setup timetwo-machine flowshopmaximum latenessremoval timeordered flowshop


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications ⋮ A bicriteria flowshop scheduling problem with setup times ⋮ Total flowtime in no-wait flowshops with separated setup times. ⋮ A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups ⋮ A new heuristic and dominance relations for no-wait flowshops with setups ⋮ Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3157767&oldid=16243953"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 3 February 2024, at 22:53.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki