Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times

From MaRDI portal
Publication:3161782
Jump to:navigation, search

DOI10.1057/jors.2008.95zbMath1196.90061OpenAlexW2006697527MaRDI QIDQ3161782

No author found.

Publication date: 18 October 2010

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.2008.95


zbMATH Keywords

sequencingsequence-dependent setup timecommon due-date assignment


Mathematics Subject Classification ID

Discrete location and assignment (90B80)


Related Items (4)

Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs ⋮ The third comprehensive survey on scheduling problems with setup times/costs ⋮ Solving the single crane scheduling problem at rail transshipment yards ⋮ Common due date assignment and single-machine scheduling with release times to minimize the weighted number of tardy jobs






This page was built for publication: Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3161782&oldid=16423769"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 4 February 2024, at 06:20.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki