Mathematical programming model for centralised master planning in ceramic tile supply chains
From MaRDI portal
Publication:3163199
DOI10.1080/00207540903055701zbMath1197.90112OpenAlexW2060823717MaRDI QIDQ3163199
M. M. E. Alemany, J. J. Boj, Francisco-Cruz Lario, Josefa Mula
Publication date: 25 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540903055701
Related Items (4)
Tactical supply chain planning models with inherent flexibility: definition and review ⋮ A tactical supply chain planning model with multiple flexibility options: an empirical evaluation ⋮ Available-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic case ⋮ Integrated material-financial supply chain master planning under mixed uncertainty
Cites Work
- Linear programming models with planned lead times for supply chain operations planning
- Coordinated supply chain management
- Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions
- Optimal planning in large multi-site production networks
- Coordinating supply chain decisions: an optimization model
- Schumann, a modeling framework for supply chain management under uncertainty
- Integrated production/distribution planning in supply chains: An invited review
- Multi-item, multi-facility supply chain planning: Models, complexities, and algorithms
- Cross-facility management of production and transportation planning problem
- Capacity and material requirement planning modelling by comparing deterministic and fuzzy models
- FUZZY LINEAR PROGRAMMING FOR SUPPLY CHAIN PLANNING UNDER UNCERTAINTY
- Simultaneous lot sizing and loading of product families on parallel facilities of different classes
- An integrated approach for production and distribution planning in supply chain management
- Planning and coordination of production and distribution facilities for multiple commodities
This page was built for publication: Mathematical programming model for centralised master planning in ceramic tile supply chains