A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
From MaRDI portal
Publication:3163722
DOI10.1080/00207540802691374zbMath1197.90240OpenAlexW2403675486MaRDI QIDQ3163722
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802691374
Related Items (2)
A heuristic method for two-stage hybrid flow shop with dedicated machines ⋮ Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
Cites Work
- Unnamed Item
- Branch and bound algorithm for the flow shop with multiple processors
- Minimizing makespan in hybrid flowshops
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Optimal two- and three-stage production schedules with setup times included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Sequencing a hybrid two-stage flowshop with dedicated machines
This page was built for publication: A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines