An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates
From MaRDI portal
Publication:3163750
DOI10.1080/00207540802534681zbMath1197.90239OpenAlexW2032581600MaRDI QIDQ3163750
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802534681
Cites Work
- Machine scheduling models in environmentally focused chemical manufacturing
- Managing batch processors to reduce lead time in a semiconductor packaging line
- The use of upstream and downstream information in scheduling semiconductor batch operations
- LP-based heuristics for scheduling chemical batch processes
- Scheduling a batch processing machine with non-identical job sizes
- Adaptive production scheduling of virtual production systems using object-oriented Petri nets with changeable structure
- Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families
- Sequence-dependent batch chemical scheduling with earliness and tardiness penalties
- Cyclic job scheduling in paced assembly lines with cross-trained workers
- Hierarchical production planning and scheduling in a multi-product, batch process environment
This page was built for publication: An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates