A rework-based dispatching algorithm for module process in TFT-LCD manufacture
From MaRDI portal
Publication:3163752
DOI10.1080/00207540802471264zbMath1197.90168OpenAlexW2166929032WikidataQ57441418 ScholiaQ57441418MaRDI QIDQ3163752
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802471264
Related Items (1)
Cites Work
- The impact of defects on a process with rework
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
- A multi-phase model for product part change problems
- An optimal batch size for an imperfect production system with quality assurance and rework
- Lot sizing in a production system with rework and product deterioration
This page was built for publication: A rework-based dispatching algorithm for module process in TFT-LCD manufacture