An adaptive scheduling algorithm for a parallel machine problem with rework processes
From MaRDI portal
Publication:3163785
DOI10.1080/00207540802484903zbMath1197.90210OpenAlexW2150542788WikidataQ57441413 ScholiaQ57441413MaRDI QIDQ3163785
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802484903
parallel machinesadaptive schedulingdispatching algorithmrework probabilityproblem-space-based search
Related Items (1)
Cites Work
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
- Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
This page was built for publication: An adaptive scheduling algorithm for a parallel machine problem with rework processes