Minimizing Total Weighted Completion Time with Unexpected Machine Unavailability
From MaRDI portal
Publication:3167370
DOI10.1007/978-3-642-31770-5_26zbMath1358.90045OpenAlexW2284341958MaRDI QIDQ3167370
Yumei Huo, Boris Reznichenko, Hairong Zhao
Publication date: 2 November 2012
Published in: Combinatorial Optimization and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-31770-5_26
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Approximation algorithms (68W25)
This page was built for publication: Minimizing Total Weighted Completion Time with Unexpected Machine Unavailability