A discrete time reactive scheduling model for new order insertion in job shop, make-to-order industries
From MaRDI portal
Publication:3168937
DOI10.1080/00207540903433858zbMath1210.90087OpenAlexW2024754025WikidataQ57526780 ScholiaQ57526780MaRDI QIDQ3168937
No author found.
Publication date: 27 April 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540903433858
Related Items (3)
Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption ⋮ Decision model for the customer order decoupling point considering order insertion scheduling with capacity and time constraints in logistics service supply chain ⋮ A hybrid method for large-scale short-term scheduling of make-and-pack production processes
Cites Work
- Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Flowshop scheduling research after five decades
- An online approach to dynamic rescheduling for production planning applications
- Production scheduling/rescheduling in flexible manufacturing
- Integrated process planning and scheduling/rescheduling—an agent-based approach
- Optimal scheduling for flexible job shop operation
This page was built for publication: A discrete time reactive scheduling model for new order insertion in job shop, make-to-order industries