An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks
From MaRDI portal
Publication:3184454
DOI10.1057/palgrave.jors.2602625zbMath1171.90412OpenAlexW2056772503MaRDI QIDQ3184454
Publication date: 15 October 2009
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602625
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (7)
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times ⋮ Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates ⋮ Hybrid flowshop scheduling with machine and resource-dependent processing times ⋮ An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times ⋮ The hybrid flow shop scheduling problem ⋮ Minimizing shifts for personnel task scheduling problems: a three-phase algorithm
This page was built for publication: An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks