Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates
From MaRDI portal
Publication:3188762
DOI10.1142/S0217595916500159zbMath1345.90046MaRDI QIDQ3188762
Publication date: 12 August 2016
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
simulated annealingtabu searchnonlinear programminggenetic algorithmnet present valuediscrete-continuous project scheduling
Nonlinear programming (90C30) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Power-aware scheduling of preemptable jobs on identical parallel processors to meet deadlines
- Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Modelling and solving grid resource allocation problem with network resources for workflow applications
- Power-aware scheduling of preemptable jobs on identical parallel processors to minimize makespan
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Tabu search for discrete-continuous scheduling problems with heuristic continuous resource allocation
- Project scheduling. A research handbook.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Tabu Search Applied to the Quadratic Assignment Problem
- Simulated Annealing and Tabu Search for Discrete-Continuous Project Scheduling with Discounted Cash Flows
This page was built for publication: Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates