Total completion time minimization on multiple machines subject to machine availability and makespan constraints
From MaRDI portal
Publication:319146
DOI10.1016/j.ejor.2014.12.012zbMath1346.90352OpenAlexW2031847401MaRDI QIDQ319146
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.12.012
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (6)
Multitasking via alternate and shared processing: algorithms and complexity ⋮ A bi-objective branch-and-bound algorithm for the unit-time job shop scheduling: a mixed graph coloring approach ⋮ Best possible algorithms for online scheduling on identical batch machines with periodic pulse interruptions ⋮ Scheduling with time-of-use costs ⋮ Parallel machine makespan minimization subject to machine availability and total completion time constraints ⋮ Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Bicriteria scheduling concerned with makespan and total completion time subject to machine availability constraints
- Capacitated two-parallel machines scheduling to minimize sum of job completion times
- Complexity of single machine, multi-criteria scheduling problems
- Current trends in deterministic scheduling
- Preemptive scheduling with variable profile, precedence constraints and due dates
- Scheduling with limited machine availability
- Multicriteria scheduling
- Scheduling with Deadlines and Loss Functions
- Bicriteria optimisation of the makespan and mean flowtime on two identical parallel machines
- A Survey on Approximation Algorithms for Scheduling with Machine Unavailability
- Minimizing Schedule Length Subject to Minimum Flow Time
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Minimizing Total Completion Time on Parallel Machines with Deadline Constraints
- A note on scheduling parallel machines subject to breakdown and repair
This page was built for publication: Total completion time minimization on multiple machines subject to machine availability and makespan constraints