Resource loading with time windows
From MaRDI portal
Publication:319369
DOI10.1016/j.ejor.2015.01.036zbMath1346.90475OpenAlexW2151851196MaRDI QIDQ319369
Kameng Nip, Fabrice Talla Nobibon, Roel Leus, Zhen-bo Wang
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/480088
Deterministic scheduling theory in operations research (90B35) Theory of organizations, manpower planning in operations research (90B70)
Related Items (2)
Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function ⋮ Polyhedral Results and Branch-and-Cut for the Resource Loading Problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Mathematical programming algorithms for bin packing problems with item fragmentation
- A branch and price solution approach for order acceptance and capacity planning in make-to-order operations
- Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment
- Order acceptance with weighted tardiness
- Scheduling semi-malleable jobs to minimize mean flow time
- Scheduling for parallel processing
- A priority-rule method for project scheduling with work-content constraints
- Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs
- Linear-Time approximation schemes for scheduling malleable parallel tasks
- Parallel machine scheduling with splitting jobs
- A dominant class of schedules for malleable jobs in the problem to minimize the total weighted completion time
- Workload based order acceptance in job shop environments
- Scheduling malleable parallel tasks: an asymptotic fully polynomial time approximation scheme
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Hierarchical models for multi-project planning and scheduling
- Scheduling and packing malleable and parallel tasks with precedence constraints of bounded width
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
- Approximating the Throughput of Multiple Machines in Real-Time Scheduling
- Complexity and approximability of the maximum flow problem with minimum quantities
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- Multiple resource leveling in construction systems through variation of activity intensities
- Dynamic order acceptance and capacity planning on a single bottleneck resource
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Parallel machine scheduling considering a job-splitting property
- Scenario-based approach for flexible resource loading under uncertainty
- Techniques for scheduling with rejection
- From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time
- A $\frac32$‐Approximation Algorithm for Scheduling Independent Monotonic Malleable Tasks
- Production Planning by Mixed Integer Programming
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Scheduling Jobs on Several Machines with the Job Splitting Property
- Scheduling
This page was built for publication: Resource loading with time windows