Scheduling resource-constrained projects with a flexible project structure
From MaRDI portal
Publication:319777
DOI10.1016/J.EJOR.2015.05.003zbMath1346.90356OpenAlexW800527894MaRDI QIDQ319777
Carolin Kellenbrink, Stefan Helber
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://diskussionspapiere.wiwi.uni-hannover.de/pdf_bib/dp-511.pdf
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (8)
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs ⋮ Evolutionary algorithms for multi-objective stochastic resource availability cost problem ⋮ Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources ⋮ Resource leveling in projects with flexible structures ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Maximising the weighted number of activity execution modes in project planning ⋮ Stochastic project scheduling with hierarchical alternatives ⋮ Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
Cites Work
- Unnamed Item
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Production scheduling with alternative process plans
- Applying local rescheduling in response to schedule disruptions
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- Stochastic project networks. Temporal analysis, scheduling and cost minimization
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of resource-constrained projects
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- A hybrid metaheuristic for the resource-constrained project scheduling problem
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A genetic algorithm for the resource constrained multi-project scheduling problem
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with multiple modes: A genetic algorithm
This page was built for publication: Scheduling resource-constrained projects with a flexible project structure